Engineering

The Engineering Department is responsible for the effective construction of municipal infrastructure within the City. These responsibilities include the construction of streets, sidewalks, drainage, water and waste water infrastructure.

The department has 6 full-time employees and uses the services of consulting engineering firms when required.

MISSION STATEMENT

To provide excellent quality engineering services of municipal capital projects from initiation phase to close-out phase for each individual project.

The latest version of the Standard Municipal Specifications 2019 can be obtained from the Engineering Department by email: engineering@miramichi.org

Our Location

City of Miramichi
Engineering Department
94 General Manson Way
Miramichi, NB   E1V 2N5

Secretary: (506) 623-2021
Email: darren.row@miramichi.org

For current construction updates please contact us at (506) 623-2021

Streets approved for 2022 asphalt resurfacing program

NORTH

  1. Waterfront Drive including Fountain Head Lane & Norton’s Lane – Milling & paving$ 135,000
  2. Lawlor Lane – From Civic 310 to End, 340 m of milling & paving –
    $ 125,000
  3. Williston Drive – From McCosh Crescent to Civic 280, 300 m of milling & paving, including widening for 1.2 m asphalt shoulder – $ 125,000
  4. Station Street – From VIA Rail to Radio Street, 300 m of pulverizing & paving, including curb and storm installation – $ 185,000
  5. Henry Street – From Jail Street to McCallum Street, 125 m of milling
    & paving – $ 30,000
  6. Preston Drive – Entire length, 320 m of pulverizing & paving –
    $ 135,000
  7. Century Drive – From Sunrise Drive to MacDonald Road, 510 m of asphalt overlay –
    $ 80,000
  8. Moorefield Road – From Route 11 to Civic 51, 500 m overlay –
    $ 80,000
  9. Rosebank Drive Entire length, 355 m of pulverizing & paving –
    $ 140,000
  10. Morton Street – Entire length, 90 m of asphalt overlay – $ 25,000
  11. McKnight, Hayden, & Shore Drive Loop – pulverizing and paving –
    $ 90,000

SOUTH

  1. King Street From Route 11 limits to Walsh Road, 220 m of milling & paving – $ 185,000
  2. Hay Lane – From Water Street to rail tracks, 195 m of asphalt removal and placement – $ 200,000
  3. Douglasfield Road Harper Road to Civic 418, 750 m of pulverizing & paving – $ 270,000
  4. Furlotte Street – Entire length, 250 m of asphalt removal and placement – $ 120,000
  5. East Point Road From Washburn Beach Road to limits, 515 m of asphalt overlay – $ 80,000
  6. Murray Street – Entire length, 110 m of milling & paving – $ 40,000
  7. Old Line Road – Route 126 to Sutton Road, 360 m of pulverizing & paving and a widening for a 1.5 m shoulder – $ 160,000
  8. Flett Street – Entire length asphalt overlay – $ 70,000

 

 